MLK Natatorium
Atlanta, GA 2006
MLK Natatorium
MLK Natatorium Project Description:
For many years, the parking lot at the site was closed to parking due to excessive cracking and verified overstressed conditions of the concrete deck slab.

Solution:
The carbon-based Tyfo® SCH-41 Composite System was utilized to strengthen the flexural capacity of the concrete parking deck slab.  Additionally, the fiberglass-based Tyfo® SEH-51A Composite System was applied to numerous concrete columns that suffered from corrosion and spalling. All members support the parking deck above.

Summary:
The strengthening of the concrete deck allowed for the parking lot to be opened at the site.
MLK Natatorium
 


Download

LATEST NEWS
 MORE INFORMATION
 
                              
                                  


Your Name  
Your Email
Comments
 
  
  Join mailing list for latest news and tech updates

 
Follow us on: