Project Description: The Beverly Hills Hilton Hotel required some major remodeling and tenant improvement work. In order to complete the project the building needed to be brought up to the current seismic code requirements.
Solution: A portion of the retrofit required the strengthening of the large reinforced concrete beams at the lobby level. The Tyfo® SCH-41 System was installed to meet the performance goal called out by the engineer-of-record.
Summary: Fibrwrap Construction was able to perform the work without any major disruption to the hotel operations.